Skip to main content

Posts

Showing posts from December, 2021

Symbol Standart P&ID

    Symbol Standarisation P&ID For Industri Standard piping and instrument symbols are detailed diagrammatic documentation that provides a set of forms & standards for documenting P&IDs and PFDs, including standard shapes for instruments, valves, pumps, heat exchangers, mixers, crushers, vessels, compressors, filters, motors and other connection forms. Here are some symbols on P&ID : So, those are some of the symbols that we will often see when reading piping & instrument diagrams. May be useful.

Basic AHU System Planning

Basic AHU System Planning Basic Problems The rapid development in various sectors of urban & industrial activities has a positive impact as well as a negative impact on environmental conditions. The negative impacts that arise are often realized only as temporary impacts from the development and development process, but in less than five years, it turns out that the environmental impacts in question have had a fairly large negative effect on various benchmarks of the quality of life of urban communities, which include the level of degradation of health and environmental comfort. The environment as a human habitation has a major influence on the behavior and habits of the people who live in it. Talking about environmental issues, then one of the things that can't be left behind is the issue of air. In areas that are quite densely active, air is a big problem that is quite a concern for regional leaders, one of which is DKI Jakarta as the capital city of the country, with its l

Hydrant And Fire Fighting System Planning

Hydrant And Fire Fighting System Planning Problem Basic In the implementation of the construction of a building, it is very necessary for building planning including architectural, structural and mechanical and electrical planning in order to create a building that can be used in accordance with the function and purpose of the building. The existing mechanical system in the building is one of the components needed in the manufacture of buildings, in general to get a comfortable and healthy building to be used for a long period of time by its occupants without destroying the architectural beauty of the building and to support all the needs and activities required. takes place in the building. Fire is something that often happens in factories and institutional buildings these days. This has a huge loss impact for the company and can even cost many lives. The fire occurred due to inappropriate procedures in fire safety installations and the unavailability of competent people in using fire

Basic Comparison of Autocad Operations Using Drawing Tools and Command Aliases

Basic Comparison of Autocad Operations Using Drawing Tools and Command Aliases Hello friends, here I will explain some of the basics of operating AutoCAD for beginners and on this occasion I will use the 2017 version of AutoCAD. For the first step, of course, we have to install this software on your PC or laptop, yes, then please open Autocad and for the initial display it looks more or less like this, more or less like this the initial appearance, then please select and click the start drawing menu to start using the autocad. This is how the initial worksheet looks like, here we are able to use this autocad. For starters I will start from how to operate autocad using the drawing tool. In this drawing tool we will get several main commands for drawing an object, including: 1. Straight Line 2. Continuous Line - Polyline 3. Circle 4. Curve 5. Rectangle 6. Elips 7. Shading 8. Etc For the next we will enter the command to modify an object, among others: 1. Move 2. Rotate 3. Cut 4. Extend 5